Door access control in Kuching: supplier or installer?

Who can open each door, and how will occupants exit during a fault?

Choose a site survey when scope is open

Prepare a door schedule covering lock type, exit hardware, opening direction and the interface with the building safety system.

HJ Security installation scope

Choose a supplier when the specification is ready

Match reader protocol, lock voltage and controller capacity. Specify who supplies the power supply, enclosure and backup.

IS Distributions equipment range

What to put in the handover checklist

Test an authorised credential, a revoked credential and the approved emergency release sequence with the responsible contractor.